Page 1 of 1
Hogsback Lane Closed
Posted: Fri Apr 08, 2011 12:33 pm
by Bret Callentine
Heard a report on the radio that Hogsback lane down into the metroparks has been closed due to erosion problems. They did not suggest a time limit on the closure.
is there anyone out there with any more information on the matter? Is this a scheduled closure? how long? etc.
Re: Hogsback Lane Closed
Posted: Fri Apr 08, 2011 2:56 pm
by Stan Austin
Bret---- This might be the impetus to rebuild that entrance. The Metroparks was trying to develop a plan about 3 years ago that would include more than just rebuilding the entrance. But nothing materialized out of that planning.
That's the last entrance besides Rockliff and Detroit that has to be rebuilt. I can't imagine that they'd do temporary buttressing when a total rebuild is inevitable.
Stan
Re: Hogsback Lane Closed
Posted: Fri Apr 08, 2011 3:18 pm
by Bryan Schwegler
Boo, that's the way I ride down into the Metroparks. Hope it's not closed long.
Re: Hogsback Lane Closed
Posted: Fri Apr 08, 2011 4:00 pm
by Stan Austin
Brett,Bryan-- I just got off the phone with Jane Christentian of the MetroParks to ask about the status of Hogsback.
First, let me express some astonishment (although I shouldn't be astonished) at the prompt and open and candid response to my phone inquiry!
As of now, they (Metroparks) will be making interim repairs to the entrance. Any long term rebuilding of the entrance is not on the agenda now.
I will continue to monitor and update the repairs as I was encouraged to do by Jane. I told her I would post on the Deck.
So, my initial reaction is---------
Winter causes damage, the public agency responsible takes initial precautions; the public agency responds with promptness and openness to a public inquiry, and that agency (to us Lakewoodites, the Valley) is making it right.
Stan
Re: Hogsback Lane Closed
Posted: Fri Apr 08, 2011 6:30 pm
by Bryan Schwegler
Great, thanks for the update!
Re: Hogsback Lane Closed
Posted: Fri Apr 08, 2011 6:54 pm
by Jim O'Bryan
[url]
Bryan Schwegler wrote:Great, thanks for the update!

Hogsback Lane back in 2005 when LO columnist sounded the warning.
It was back in 2005 when Gordon Brumm and I first looked into this dangerous situation. What we found was that no one was willing to do a thing. The City of Lakewood owns part, the City of Cleveland owns part, even the county and state own part. No one can agree on
what part.
http://www.google.com/url?sa=t&source=web&cd=2&sqi=2&ved=0CBoQFjAB&url=http%3A%2F%2Fmedia.lakewoodobserver.com%2Fissue_pdfs%2FObserver%2520Vol.%252003%2520Issue%252001.pdf&rct=j&q=hogsback%20lane%20Lakewood%20Observer%20Brumm&ei=v5yfTcbGDKPv0gHrhdH_BA&usg=AFQjCNFg-fTpFw16L_9s8IDcHer9CTkHLA
Gordon measuring the middle post of the Armco Barrier. Notice the land behind it.
Latter Bill Grulich put a call out to help Hogsback Road on the Deck here:
http://www.lakewoodobserver.com/forum/viewtopic.php?f=7&t=3224and Stan Austin reported on in in 2006
http://www.lakewoodobserver.com/read/06/12/11/century-church-celebrated
2005

2006

Those trees you see at the bottom, were at the top a week ago!

.