At its June 5 meeting, the Lakewood Board of Education shared the parameters that it is using when considering any proposals to purchase the Board of Education property on Warren Road. Those criteria are:
-Ensure the safety and security of Grant Elementary School
-Purchase price
-Guarantee occupancy for current Board offices for minimum 12-18 months
-Preserve historical nature of the East Rockport building
-Return of tax paying property to the tax duplicate
BOE sets considerations for sale of property
Moderator: Jim O'Bryan
-
Edward Favre
- Posts: 381
- Joined: Thu Aug 25, 2005 6:46 pm
-
jackie f taylor
- Posts: 773
- Joined: Thu Sep 08, 2011 8:47 am
Re: BOE sets considerations for sale of property
that is a tighter loose.
-
jackie f taylor
- Posts: 773
- Joined: Thu Sep 08, 2011 8:47 am
Re: BOE sets considerations for sale of property
an inflatable raft with a leak, a hot air balloon with no heat, a paratrooper with no string.