Great work on Lincoln
Moderator: Jim O'Bryan
-
Shawn Juris
- Posts: 69
- Joined: Tue Feb 16, 2010 5:33 pm
Great work on Lincoln
Thank you to the city and the road crew for the resurfacing job on the portion of Lincoln between Madison and Franklin. Very little disruption and a great new surface.
-
J Hrlec
- Posts: 480
- Joined: Thu Aug 24, 2006 7:17 pm
I also notice the rest of Lewis road surface was completed as well, from Madison to Lakewood Heights. Found this list of all streets that are scheduled to be done.
http://www.ci.lakewood.oh.us/pdf/2008_E ... s_0508.pdf
http://www.ci.lakewood.oh.us/pdf/2008_E ... s_0508.pdf
-
sharon kinsella
- Posts: 1490
- Joined: Fri May 18, 2007 7:54 am
- Contact:
-
J Hrlec
- Posts: 480
- Joined: Thu Aug 24, 2006 7:17 pm
I agree. I don't drive on every street but as far as main throughways, both Riverside near Detroit and Bunts Rd. North of Franklin stand out in my mind as areas which require much needed repair.sharon kinsella wrote:I'm glad they're going to do Riverside Dr.
Now I won't have to go into for wheel drive to get to Detroit anymore.